What changes in Atlanta?
The Congress Center runs 72 loading docks with drive-on hall access across halls A1 to C4, so load-in is called dock by dock rather than in one wave.
Source: gwcc.com

The Congress Center runs 72 loading docks with drive-on hall access across halls A1 to C4, so load-in is called dock by dock rather than in one wave.
Source: gwcc.com
Georgia World Congress Center's 72 loading docks and drive-on access serve halls ranging from A1 through C4, so labor should be staged by assigned dock and hall instead of one building-wide call.
Source: gwcc.com
Put the freight appointment, truck entrance, worker check-in, equipment, build sequence, venue labor limits, inter-hall transfers, and strike release on each shift. Separate crews when parallel docks are active, and name the lead responsible for reconciling delays. A prior show's route cannot replace the current move-in schedule for a campus of this scale.
Source: gwcc.com